Search Results for

Advancing Power Electronics at PCIM Asia 2025 

Richard Wright presents advances analysis of Voltage Rise Phenomena in Electrically Floating HV Power Platforms at PCIM Asia 2025.

MORGRIP® Connectors Successful Parallel Testing

CSS successfully carried out parallel testing on 2 off 28″ and 1 off 32″ MORGRIP® connectors at our facility in Wednesbury, UK.

From “Pure Hell” to a Breakthrough in Brazil

Kristian speaks to Finansavisen, Norway’s major business newspaper, about his turbulent journey from entrepreneurship to redefining subsea distribution solutions with CSS

Successful Comprehensive Testing for 2 off 28″ MORGRIP® Pipeline Connectors

Connector Subsea Solutions has successfully completed the comprehensive testing for 2 off 28″ MORGRIP® subsea pipeline connectors, confirming its integrity, reliability, and readiness for offshore deployment.

MORGRIP® Connectors Built, Tested and Ready for Offshore Mobilisation

Connector Subsea Solutions (CSS) has built and tested 2 off 8″ and 1 off 20″ MORGRIP® hybrid flange adaptors. They are now stored at CSS and ready for mobilisation.

Compact HTCU Delivered with Fully Integrated Software System from CSSI

Connector Subsea Solutions Isotek (CSSI) supported the deployment of a compact Hot Tap Cutter Unit with a fully integrated control software system.

CSSI to Present High Voltage Research at PCIM New Delhi 2025

Connector Subsea Solutions Isotek (CSSI) Richard Wright presents at PCIM Asia 2025 on voltage rise in floating HV platforms and its relevance to subsea power systems.

World’s First Diver-Friendly Wedge Activation Clamp for Confined Space Repair

Connector Subsea Solutions (CSS) delivered a diver-friendly MORGRIP® conductor repair clamp using wedge activation and an integrated centraliser to restore a shutdown well in a confined guide.

Software Engineering Team Deployed Offshore For Live Operation

Connector Subsea Solutions Isotek (CSSI) proved its offshore software engineering capabilities in a live operation.