Yesterday at 19.30GMT our MORGRIP 16″ Flange Adaptor was successfully installed offshore the West coast of Denmark, in 38m water depth. This operation is part of a wider bypass project with a 24″ installation due to take place in the New Year.

Yesterday at 19.30GMT our MORGRIP 16″ Flange Adaptor was successfully installed offshore the West coast of Denmark, in 38m water depth. This operation is part of a wider bypass project with a 24″ installation due to take place in the New Year.

Richard Wright presents advances analysis of Voltage Rise Phenomena in Electrically Floating HV Power Platforms at PCIM Asia 2025.
CSS successfully carried out parallel testing on 2 off 28″ and 1 off 32″ MORGRIP® connectors at our facility in Wednesbury, UK.
Kristian speaks to Finansavisen, Norway’s major business newspaper, about his turbulent journey from entrepreneurship to redefining subsea distribution solutions with CSS
Connector Subsea Solutions has successfully completed the comprehensive testing for 2 off 28″ MORGRIP® subsea pipeline connectors, confirming its integrity, reliability, and readiness for offshore deployment.
Connector Subsea Solutions (CSS) has built and tested 2 off 8″ and 1 off 20″ MORGRIP® hybrid flange adaptors. They are now stored at CSS and ready for mobilisation.
Connector Subsea Solutions Isotek (CSSI) supported the deployment of a compact Hot Tap Cutter Unit with a fully integrated control software system.
Connector Subsea Solutions Isotek (CSSI) Richard Wright presents at PCIM Asia 2025 on voltage rise in floating HV platforms and its relevance to subsea power systems.
Connector Subsea Solutions Isotek (CSSI) proved its offshore software engineering capabilities in a live operation.
SDA will attend SPE Brazil Subsea Symposium 2025 as a proud Gold Sponsor. Join us at Stand 11 to see how integrated subsea distribution supports safe, reliable and efficient offshore operations.