Field-proven technology for the removal of all corrosion and insulation coatings, including FBE, at any water depth, without any risk of damaging the parent pipeline.

FEATURES

  • Patented cutting head technology for the removal of hard pipeline coatings including FBE, without removal of parent metal
  • Follows the contour of the pipe regardless of pipeline tolerances and ovality
  • Suitable for both horizontal and vertical application
  • Lightweight and easy to use in ROV operation
  • Can also be used to reduce coating thickness rather than remove coating entirely

SPECIFICATIONS

  • Configuration 1: suitable for pipeline sizes 4″ (bare pipe) to 14″ (with coatings)
  • Configuration 2: suitable for pipeline sizes 10″ (bare pipe) to 24″ (with coatings)
  • Configuration 3: suitable for pipeline sizes 18″ (bare pipe) to 36″ (with coatings)
  • Axial stroke for length of coating removal 1 300 mm
  • Working pressure 207 barg / 3 000 psi
  • Minimum flow required >38 l/min
  • Interfaces to Connector Subsea Solutions ROV Skids/Backpacks and Topside Control Systems

Solution applications

Preparation of pipeline surface, ensuring suitability for:

  • Installation of pipeline connectors
  • Installation of pipeline clamps
  • Pipeline inspection